Vendor NDAs, Evaluation Agreements, and Device Contracts
Vendor NDAs, Evaluation Agreements, and Device Contracts: scope, decisions, requirements, evidence, risks, and traceability for the Agent OS programme.
Vendor NDAs, Evaluation Agreements, and Device Contracts
This document is an engineering issue map for qualified counsel and compliance specialists; it is not legal advice or a substitute for jurisdiction-specific review.
Table of Contents
- Purpose and Scope
- Normative Position
- Operating Model
- Requirements
- Failure and Degradation
- Evidence and Acceptance
- Implementation Obligations
- Risks and Open Questions
- Related Documents
- Planning Reference Anchors
Purpose and Scope
Area: Legal and Compliance.
This document is an engineering issue map for qualified counsel and compliance specialists; it is not legal advice or a substitute for jurisdiction-specific review.
This document owns the semantics implied by Vendor NDAs, Evaluation Agreements, and Device Contracts. It does not assert that every described subsystem already exists. It defines the target model, constraints, evidence needed to trust an implementation, and the boundary with adjacent documents.
Normative Position
- Architect contract-ready board packages, firmware manifests, test hooks, provisioning, calibration, update ownership, security response, lifecycle, and certification evidence.
- Request documentation rights and engineering support explicitly; do not assume an NDA grants source, redistribution, or long-term maintenance rights.
- Keep product layers independent of one ODM BSP.
Operating Model
The operating model is contract-first and evidence-driven. A component declares its authority, resources, lifecycle, error model, cancellation and timeout behavior, observability, version, and compatibility promise. Backends are replaceable only when the same conformance suite passes and no forbidden platform type leaks into portable layers.
Implementation proceeds through a reference model or mock, deterministic QEMU evidence where relevant, documentation-first physical hardware, and quality-hardware evidence. Pixel 9 adapters remain quarantined according to ADR-0004.
Requirements
- R01. Architect contract-ready board packages, firmware manifests, test hooks, provisioning, calibration, update ownership, security response, lifecycle, and certification evidence.
- R02. Request documentation rights and engineering support explicitly; do not assume an NDA grants source, redistribution, or long-term maintenance rights.
- R03. Keep product layers independent of one ODM BSP.
- R04. Specify normal, partial, denied, timeout, cancellation, restart, upgrade, and permanent-failure behavior.
- R05. Expose structured diagnostics without leaking secrets or vendor-specific implementation details.
- R06. Link material unknowns to a claim and, when testable, an experiment with an owner and gate.
- R07. Update affected documentation and task data when evidence changes the model.
Failure and Degradation
Degradation must be explicit rather than accidental. The system reports capability absence, reduced quality, unavailable provider, stale data, or unsafe condition through typed states. It must not silently fall back to broader authority, unrestricted legacy execution, unverified firmware, lossy data migration, or irreversible agent action.
Recovery defines what state is retained, reconstructed, re-enrolled, compensated, or intentionally discarded. Unsupported hardware or providers are rejected at binding time where possible.
Evidence and Acceptance
- RFI/RFQ matrix and redlined agreement.
- Reference BSP portability review.
- Pilot manufacturing, provisioning and OTA rehearsal.
- Evidence records target identity, hardware revision, firmware, source commit, toolchain, configuration, seed, timestamps, artifacts, expected result, actual result, and reviewer.
- Acceptance requires the referenced tasks to meet their own criteria; prose completion is not implementation completion.
Implementation Obligations
Risks and Open Questions
- Minimum order quantities, NRE, certification, support discontinuity and opaque subcontractors can overwhelm the programme.
- Vendor changes can break reproducibility and update rights.
- Contract clauses can prevent community publication.
- Open-question rule: an unanswered high-impact question becomes a claim/experiment record and cannot be hidden in meeting notes.
- Stop rule: work stops or changes track when legal rights, recovery, debug access, safety, or the required evidence path is unavailable.
Related Documents
- Product vision
- Portable system architecture
- Portable device-service contracts
- Hardware portfolio
- Decision gates
- Claim register
Planning Reference Anchors
Device
AOS-ODM-101 — Prepare the future ODM/JDM RFI data-room schema
Nda
AOS-LEGAL-023 — Prepare vendor NDA, evaluation, source, firmware, and escrow checklist