Skip to content
AOS-HW-002 Normative foundation

Pixel 9 Quality-Hardware Track

Pixel 9 Quality-Hardware Track: scope, decisions, requirements, evidence, risks, and traceability for the Agent OS programme.

Pixel 9 Quality-Hardware Track

This specification treats hardware support as an evidence programme with explicit documentation rights, recovery paths, quality gates, and replacement strategies.

Table of Contents

Purpose and Scope

Area: Hardware Programme.

This specification treats hardware support as an evidence programme with explicit documentation rights, recovery paths, quality gates, and replacement strategies.

This document owns the semantics implied by Pixel 9 Quality-Hardware Track. It does not assert that every described subsystem already exists. It defines the target model, constraints, evidence needed to trust an implementation, and the boundary with adjacent documents.

Normative Position

  1. Pixel 9 is an evidence and quality-ceiling track, not the platform architecture.
  2. Allowed Android/Linux uses are stock baselines, lawful observation, recovery, extraction, and temporary isolated bridges with end dates.
  3. Every legacy cell declares inputs, outputs, taint, license, security boundary, replacement owner, and final acceptable gate.

Operating Model

The operating model is contract-first and evidence-driven. A component declares its authority, resources, lifecycle, error model, cancellation and timeout behavior, observability, version, and compatibility promise. Backends are replaceable only when the same conformance suite passes and no forbidden platform type leaks into portable layers.

Implementation proceeds through a reference model or mock, deterministic QEMU evidence where relevant, documentation-first physical hardware, and quality-hardware evidence. Pixel 9 adapters remain quarantined according to ADR-0004.

Requirements

  • R01. Pixel 9 is an evidence and quality-ceiling track, not the platform architecture.
  • R02. Allowed Android/Linux uses are stock baselines, lawful observation, recovery, extraction, and temporary isolated bridges with end dates.
  • R03. Every legacy cell declares inputs, outputs, taint, license, security boundary, replacement owner, and final acceptable gate.
  • R04. Specify normal, partial, denied, timeout, cancellation, restart, upgrade, and permanent-failure behavior.
  • R05. Expose structured diagnostics without leaking secrets or vendor-specific implementation details.
  • R06. Link material unknowns to a claim and, when testable, an experiment with an owner and gate.
  • R07. Update affected documentation and task data when evidence changes the model.

Failure and Degradation

Degradation must be explicit rather than accidental. The system reports capability absence, reduced quality, unavailable provider, stale data, or unsafe condition through typed states. It must not silently fall back to broader authority, unrestricted legacy execution, unverified firmware, lossy data migration, or irreversible agent action.

Recovery defines what state is retained, reconstructed, re-enrolled, compensated, or intentionally discarded. Unsupported hardware or providers are rejected at binding time where possible.

Evidence and Acceptance

  • Dependency scan proving no Android/Linux types above adapters.
  • SKU-specific acquisition and recovery dossier.
  • Native replacement or explicit track termination at each gate.
  • Evidence records target identity, hardware revision, firmware, source commit, toolchain, configuration, seed, timestamps, artifacts, expected result, actual result, and reviewer.
  • Acceptance requires the referenced tasks to meet their own criteria; prose completion is not implementation completion.

Implementation Obligations

Task Obligation Priority Gate/Milestone Verification
AOS-P9-000 Pixel 9 Quality-Hardware Research epic P1 Continuous monthly project review and gate reconciliation
AOS-P9-001 Complete Pixel 9 target and legal dossier P0 M1 architecture/hardware/security/legal review against official/current sources and acquired unit
AOS-P9-010 Verify Pixel 9 acquisition, unlock, relock, and stock restore P0 M1 EXP-030 on at least two development units with factory restore and one preserved stock oracle
AOS-P9-011 Automate Pixel stock recovery and artifact inventory P0 M1 recover from intentionally bad noncritical image/state and reproduce on a second unit
AOS-P9-020 Build Pixel 9 stock camera/display/power quality oracle P1 M5 EXP-035 repeated across two units, software versions, controlled scenes/workloads and battery states
AOS-P9-022 Define temporary Pixel sidecar/proxy contracts and retirement plan P2 M4 disconnect/compromise/version mismatch/replay/data minimization and native-backend swap tests
AOS-P9-030 Reach lawful reproducible Agent OS early diagnostics on Pixel 9 P0 M7 EXP-032 repeated from stock/recovery states on two units, malformed image and loss-of-diagnostic tests
AOS-P9-031 Map Pixel boot, memory, interrupt, timer, IOMMU, and storage architecture P1 M7 clean-room/source review, controlled probes, consistency with boot traces and independent reviewer
AOS-P9-040 Evaluate native Pixel storage, USB, display, and touch paths P0 M7 EXP-033 cold boots, I/O/display/touch/reset/driver-fault and bad-image recovery across two units
AOS-P9-041 Evaluate native Pixel audio and basic device-service paths P2 M7 controlled output/input/button/sensor/power transitions, failure and privacy tests where feasible
AOS-P9-050 Evaluate Pixel GPU, display acceleration, power, and thermal feasibility P0 M7 EXP-034 first accelerated workload or bounded blocker, power/thermal transitions and interface/provenance review
AOS-P9-051 Evaluate native Pixel camera feasibility and quality gap P1 M7 compare accessible native evidence to stock oracle and portable camera API; legal/security/camera review
AOS-P9-052 Evaluate Pixel modem, radio, secure element, and verified-boot boundaries P2 M7 official/public-source and approved black-box review with security/cellular/legal specialists
AOS-P9-070 Issue Pixel 9 continue, limit, or stop gate decision P0 M7 cross-functional review with comparison to documented/open/custom alternatives
AOS-LEGAL-007 Approve Pixel 9 research boundary P0 M1 counsel and architecture review against proposed Pixel experiments

Risks and Open Questions

  • A temporary bridge can become permanent through schedule pressure.
  • Factory images and firmware may restrict redistribution or reverse engineering.
  • Pixel SKUs, unlockability, firmware, and vendor interfaces vary.
  • Open-question rule: an unanswered high-impact question becomes a claim/experiment record and cannot be hidden in meeting notes.
  • Stop rule: work stops or changes track when legal rights, recovery, debug access, safety, or the required evidence path is unavailable.

Related Documents

Planning Reference Anchors

Allowed Legacy Uses

AOS-LEGAL-007 — Approve Pixel 9 research boundary

Camera Feasibility

AOS-P9-051 — Evaluate native Pixel camera feasibility and quality gap

Decision Gate

AOS-P9-070 — Issue Pixel 9 continue, limit, or stop gate decision

Device Acquisition

AOS-P9-010 — Verify Pixel 9 acquisition, unlock, relock, and stock restore

Gpu And Display

AOS-P9-050 — Evaluate Pixel GPU, display acceleration, power, and thermal feasibility; AOS-P9-050 — Evaluate Pixel GPU, display acceleration, power, and thermal feasibility

Phase One Boot

AOS-P9-030 — Reach lawful reproducible Agent OS early diagnostics on Pixel 9

Phase Three Essential Io

AOS-P9-040 — Evaluate native Pixel storage, USB, display, and touch paths; AOS-P9-041 — Evaluate native Pixel audio and basic device-service paths

Phase Two Platform

AOS-P9-031 — Map Pixel boot, memory, interrupt, timer, IOMMU, and storage architecture

Power And Thermal

AOS-P9-050 — Evaluate Pixel GPU, display acceleration, power, and thermal feasibility; AOS-P9-050 — Evaluate Pixel GPU, display acceleration, power, and thermal feasibility

Quality Oracle

AOS-P9-020 — Build Pixel 9 stock camera/display/power quality oracle

Radio And Security

AOS-P9-052 — Evaluate Pixel modem, radio, secure element, and verified-boot boundaries

Recovery First

AOS-P9-011 — Automate Pixel stock recovery and artifact inventory

Sidecar And Proxy

AOS-P9-022 — Define temporary Pixel sidecar/proxy contracts and retirement plan

Target Dossier

AOS-P9-001 — Complete Pixel 9 target and legal dossier

Track Purpose

AOS-P9-000 — Pixel 9 Quality-Hardware Research epic